Site visit conducted this period. External envelope remains substantially complete. Internal first-fix works continue across accessible areas. Roof coverings remain installed to the main structure. No material visual changes observed to site access, boundaries, or overall site configuration since the previous visit.
Front Elevation
Static front elevation record showing external envelope and access condition.
Arial
Single-pass aerial record showing overall roof and building condition, external envelope, and site context.
January 2025 Update
Site visit conducted 21/01/25
Rear Elevation
Static rear elevation record showing external envelope and access condition.
Walkaround
Continuous ground-level walkthrough recording observable internal and external site conditions along the standard inspection route.